REMOVAL OF PRIMARY CIRCUIT COMPONENTS FROM THEnPEACH BOTTOM HTGR

机译:从高压底部高温气冷堆中去除初级电路元件

获取原文

摘要

Subsequent to shutdown of the Peach Bottom High-Temperature Gas-Cooled Reactor for decommissioning, steam generator and primary circuit ducting samples were removed for subsequent evaluation and design methods verification. The work was part of the Peach Bottom End-of-Life Program and was performed by Catalytic Incorporated under subcontract to General Atomic Company.nEngineering and planning prior to initiation of site work required integration with proposed decommissioning activities and included (1) devel opment of engineering specifications and control work packages, (2) detailed planning and scheduling, (3) establishment of quality assurance, health physics, and safety programs, (4) negotiations with the BoilermakerS union, Philadelphia Electric Company, etc. , (5) procurement of materals and initiation of subcontracts, and (6) site visits to plan means of access.

著录项

  • 作者

  • 作者单位
  • 年度 1977
  • 页码 1-154
  • 总页数 154
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号