Preliminary Economic Analysis of Bureau of Mines Low-Btu Gasification:Combined-Cycle Power Generating System Producing 299.0 Megawatts,Pittsburgh Coal Seam.

机译:矿山局低Btu气化的初步经济分析:联合循环发电系统产生299.0兆瓦,匹兹堡煤层。

获取原文

摘要

The Bureau of Mines has developed and operated a pilot-plant size,fixed-bed gas producer which operates at 120psig and burns caking coals;that is,no pretreatment is necessary. The pilot plant data have been supplied by Bureau of Mines personnel and were collected from experimental runs on a highly caking Pittsburgh seam coal. On the basis of the pilot plant data,power costs have been estimated for a full size plant based on July 1975cost indexes. The evaluation includes sulfur removal,an ammonium sulfate plant, a water-scrubbing system for tar removal,and a combined-cycle power generating plant. A fixed-bed pressure producer gasification plant to gasify 140.4tons per hour of Pittsburgh seam coal with a combined-cycle power generation system to produce 299MW net power will require a capital investment of $151,221,200or $505.76per kW of net generating capacity. The selling price of power to support a 17-percent capital charge,with the cost of coal a parameter,will vary from 22.4to 24.3mills/kW-hr for coal costs varying from $11to $15/ton. (ERA citation 01:018421)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号