DEVELOPING MAINTAINABILITY IN CONTROLLED THERMONUCLEAR REACTORS

机译:在受控的热核反应堆中开发可维护性

获取原文

摘要

During the period 1 February through 31 March, 1977 the study has concentrated on the selection of availability goals for tokamak fusion reactors and the develop¬ment of time line flow diagrams for replacement of the first wall and blanket modules of the three baseline reactor designs. Overall plant availabilities have been selected at 72% for a nominal goal and 62% for a threshold. For fusion unique equipment these availabilities became 85% and 79%, respectively. The tireline for replacement of the UWMAK III first wall and blanket is complete with a total contin¬uous time requirement of 29 days for one reactor segment. This translates to an availability of 87% (undiluted for personnel utilization and other similar factors) for fusion unique equipment when using one possible maintenance plan, in addition, a detailed study plan has been developed and accepted by DMFE, ERDA and a survey of maintenance practices and problems was conducted in eight fission reactor related facilities.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号