首页> 美国政府科技报告 >Documentation of the Brookhaven Energy I-O and I-O/BESOM Linkage
【24h】

Documentation of the Brookhaven Energy I-O and I-O/BESOM Linkage

机译:Brookhaven Energy I-O和I-O / BEsOm Linkage的文档

获取原文

摘要

This paper documents the BNL input-output model and its linkage with the BNL linear activity analysis model, BESOM. Linking of the I-O and the linear programming (LP) models permits assessment of economy-wide impacts of future technological changes in both the energy sector and elsewhere in the economy as well as impacts arising from a wide range of government energy policies. This paper describes the development and structure of the current version of the BNL I-O model presently in use and the structural modifications of a capital-investment routine, and a balance-of-payments routine that have been incorporated. Also, the structure and solution techniques for the linked I-O/LP model are described. (ERA citation 04:023414)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号