首页> 美国政府科技报告 >Evaluation of Selected Chemical Processes for Production of Low-Cost Silicon (Phase II). Silicon Material Task, Low-Cost Solar Array Project. Tenth Quarterly Progress Report, January 1--March 31, 1978
【24h】

Evaluation of Selected Chemical Processes for Production of Low-Cost Silicon (Phase II). Silicon Material Task, Low-Cost Solar Array Project. Tenth Quarterly Progress Report, January 1--March 31, 1978

机译:用于生产低成本硅的选定化学过程的评估(阶段II)。硅材料任务,低成本太阳能电池阵列项目。 1978年1月1日至3月31日的第十季度进展报告

获取原文

摘要

Progress from January 1 to March 31, 1978, is reported in design of the 50 MT/year experimental facility for the preparation of high-purity silicon by the zinc vapor reduction of silicon tetrachloride in a fluidized bed of seed particles to form a free-flowing granular product. The design of the experimental facility has been concluded and sent to JPL for evaluation. It is also being critiqued by an independent pilot plant design group at BCL. Detailed analyses of equipment and construction costs have led to an estimate of $1.5 million for construction of the facility in an available building at BCL. Although the design was frozen for purposes of cost estimation, some improvements have been made since, and others are contemplatd before it is necessary to freeze the design for construction. Representative flow sheets and related equipment drawings are shown. (ERA citation 04:002779)

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号