首页> 美国政府科技报告 >System Design Verification of a Hybrid Geothermal/Coal Fired Power Plant
【24h】

System Design Verification of a Hybrid Geothermal/Coal Fired Power Plant

机译:混合式地热/燃煤电厂系统设计验证

获取原文

摘要

This hybrid plant utilizes geothermal fluid for feedwater heating. With respect to the extraction of available work from the geothermal fluids, this cycle is approximately two times as efficient as the all geothermal plant. The System Design Verification Study presented verifies the technical and economic feasibility of the hybrid plant. This report is comprised of a conceptual design, cost estimate, and economic analysis of a one-unit 715 MW hybrid geothermal/coal fired power plant. In addition to the use of geothermal fluid for feedwater heating, its use is also investigated for additional power generation, condensate and cooling tower makeup water, coal beneficiation, air preheating, flue gas reheating and plant space heating requirements. An engineering and construction schedule for the hybrid plant is also included. (ERA citation 05:011769)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号