Refurbishing of the Cresap Test Center. Interim Report, May 1974-September 1977

机译:翻新Cresap测试中心。中期报告,1974年5月至1977年9月

获取原文

摘要

The pilot plant at Cresap, West Virginia was originally set up as a project to produce high octane gasoline from coal. The design was accomplished by the C.W. Nofsinger Company under contract to the Consolidation Coal Company, and construction was completed in 1967 by the Dravo Company. The plant operated until April, 1970. It was plagued throughout its operating life by numerous mechanical failures. Subsequent to the shutdown, an engineering survey was made by the Foster-Wheeler Corporation, who concluded that the process was technically feasible but that certain design modifications of the pilot plant were necessary to improve mechanical reliability. Fluor was awarded a contract in May, 1974 to reactivate the plant. The Consol Synthetic Fuels (CSF) process was retained as the basic design, but the target product specifications were shifted from a light synthetic crude oil to a clean liquid fuel suitable for large stationary steam boilers such as are used in the electric power generation industry. The plant has been modified to incorporate an extensive testing program to establish the reliability of equipment components critical to coal liquefaction processes. This report provides a detailed analysis of the plant changes needed to meet the contractual objectives. In addition, this report contains a process description, process and mechanical flow diagrams, an equipment list, and photographs of the plant site at various stages of the construction. (ERA citation 05:012945)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号