首页> 美国政府科技报告 >GRID CONNECTED INTEGRATED COMMUNITY ENERGY SYSTEM Phase II, Stage 1 Final Report Finance Plan and Institutional Analysis
【24h】

GRID CONNECTED INTEGRATED COMMUNITY ENERGY SYSTEM Phase II, Stage 1 Final Report Finance Plan and Institutional Analysis

机译:网格连接集成社区能源系统第二阶段,第一阶段最终报告财务计划和机构分析

获取原文

摘要

The initial approach to HEW officials indicates that though funds are not presently available, they are hopeful of an appropriation from Congress to support these types of programs.nThe attached funding program (Basic Plan and Option I), using HEW 3 percent loans, indicates that the University of Minnesota Grid-ICES is cost effective. The projections for Options II and III, using modified grants and loans, will be submitted with the Phase II final report. The low interest loan program indicates a return from the sale of electricity of one to 4 mils/KWHr.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号