首页> 美国政府科技报告 >Geopressured-Geothermal Drilling and Testing Plan. General Crude Oil--Dept. Of Energy Pleasant Bayou No. 1 Well, Brazoria County, Texas
【24h】

Geopressured-Geothermal Drilling and Testing Plan. General Crude Oil--Dept. Of Energy Pleasant Bayou No. 1 Well, Brazoria County, Texas

机译:地压 - 地热钻探和测试计划。一般原油 - 部门。能源pleasant Bayou No.1 Well,德克萨斯州布拉佐里亚县

获取原文

摘要

As a result of geopressured resource assessment studies in the Gulf Coast region, the Brazoria fairway, located in Brazoria County, Texas was determined to be an optimum area for additional studies. A plan is presented for drilling, completion, and testing of one geopressured-geothermal well and two disposal wells in Brazoria County, Texas. The objectives of the well drilling and testing program are to determine the following parameters: reservoir permeability, porosity, thickness, rock material properties, depth, temperature, and pressure; reservoir fluid content, specific gravity, resistivity, viscosity, and hydrocarbons in solution; reservoir fluid production rates, pressure, temperature, production decline, and pressure decline; geopressured well and surface equipment design requirements for high-volume production and possible sand production; specific equipment design for surface operations, hydrocarbons distribution, and effluent disposal; and possibilities of reservoir compaction and/or surface subsidence. (ERA citation 03:054881)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号