首页> 美国政府科技报告 >EVALUATION OF SELECTED CHEMICAL PROCESSES FOR PRODUCTION OF LOW-COST SILICON. PHASE III Fifteenth Quarterly Progress Report for April 1—June 30,1979
【24h】

EVALUATION OF SELECTED CHEMICAL PROCESSES FOR PRODUCTION OF LOW-COST SILICON. PHASE III Fifteenth Quarterly Progress Report for April 1—June 30,1979

机译:生产低成本硅的选择化学过程的评价。第三阶段1979年4月1日至6月30日的第十五季度进展报告

获取原文

摘要

Progress has been made during this quarter on the assembly of the Process Development Unit (PDU) consisting of four of the critical components of the 50 MT/year Experimental Process System Development Unit (EPSDU), to be operated full scale but in an 8-hour batch mode. The target operation date of October 1, 1979, still appears attainable.nAn experimental wetted-wall condenser, about 1/10 the size of the PDU/EPSDU design was operated to demonstrate that recirculated liquid zinc chloride can indeed be used to wash down the condensed by-product of the fluidized-bed reactor containing finely divided solid zinc and some silicon dust. The temperature distribution proved to be more critical than antici¬pated but the condenser now appears to be operable. Some improvement in condensation efficiency is desirable, however.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号