首页> 美国政府科技报告 >Annual Report Volume Ⅰ ENVIRONMENTAL BASELINE MONITORING IN THE AREA OF GENERAL CRUDE OIL-DEPARTMENT OF ENERGY PLEASANT BAYOU NUMBERⅠ-A GEOPRESSURED-GEOTHERMAL TEST WELL-1978
【24h】

Annual Report Volume Ⅰ ENVIRONMENTAL BASELINE MONITORING IN THE AREA OF GENERAL CRUDE OIL-DEPARTMENT OF ENERGY PLEASANT BAYOU NUMBERⅠ-A GEOPRESSURED-GEOTHERMAL TEST WELL-1978

机译:年度报告第一卷环境基准监测在一般原油油区的能源快乐BaYOU号Ⅰ-GEOpREssURED-GEOTHERmaL TEsT WELL-1978

获取原文

摘要

A program to monitor baseline air and water quality, subsidence, microseismic activity, and noise in the vicinity of Brazoria County geopre«ured-geothermaI test well, Pleasant Bayou #1 and #2 has been underway since March 1978 (fig. 1). The findings of certain portions of the work, including the results of an initial first-order leveling survey completed by Teledyne Getronics, a preliminary noise survey completed by Radian Corporation, a preliminary microseismicity survey completed by Teledyne Scotch, and an archeological survey of the site completed by Texas A and M University have been reported earlier and will not be repeated here.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号