首页> 美国政府科技报告 >Testing,Planning,and Redrilling of Geothermal Test Hole GT-2,Phases IV and V. Progress Report.
【24h】

Testing,Planning,and Redrilling of Geothermal Test Hole GT-2,Phases IV and V. Progress Report.

机译:地热测试孔GT-2的测试,计划和再钻,阶段IV和V.进展报告。

获取原文

摘要

Holes GT-2and EE-1comprise the two deep drill holes of the Los Alamos Hot Dry Rock Geothermal Energy Extraction Experiment. EE-1had been directionally drilled to intersect a hydraulic fracture extending outward from near the bottom of GT-2,thus completing the underground circulation loop. After the drilling of EE-1, a 16-month period of experimental testing ensued to determine the characteristics of the reservoir. This period is designated as Phase IV and includes work done in GT-2and EE-1. As a result of this testing,it was determined that parallel fracture zones existed at the bottoms of both holes,and that the impedance to flow between the holes was too high for a meaningful flow experiment. A plan was then adopted to directionally drill out of GT-2at a depth of about 2600 m (8500ft) to intersect the fracture zone near the bottom of EE-1to create a better connection. The directional drilling strategy,cementing practices,bit selections,coring procedures,and logging results comprise the Phase V work. (ERA citation 04:022541)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号