首页> 美国政府科技报告 >System Analysis,Design and Proof-of-Concept Experiment of a Total Energy System. Phase II:Final Report,September 16, 1977--May 15, 1978.
【24h】

System Analysis,Design and Proof-of-Concept Experiment of a Total Energy System. Phase II:Final Report,September 16, 1977--May 15, 1978.

机译:总能量系统的系统分析,设计和概念验证实验。第二阶段:最终报告,1977年9月16日 - 1978年5月15日。

获取原文

摘要

In Phase I of this program,Philips Laboratories investigated the application of Stirling cycle prime movers to total energy power generation systems. Electrical,heating,and cooling demand profiles for a typical residential complex,hospital,and office building were studied,and alternative Stirling total energy systems were conceptualized for each site. These were analyzed in detail and constrasted with purchased-power systems for these sites to determine fuel-energy savings and investment attractiveness. The residential complex and hospital were shown to be excellent candidates for total energy systems,and prime movers in the 1000kW output range would be required. While Stirling engines with so large an output have not been built to date,there would be no fundamental technical barrier to prevent this. In Phase II,alternative candidate Stirling engine configurations for a 1000kW prime mover were evaluated to determine the configuration showing the most desirable combination of pertinent characteristics. Both single-cylinder and multi-cylinder,and single-acting and double-acting configurations were considered. Having expressed all characteristics in terms of cost-of-ownership,the multi-cylinder (8),single-acting configuration was shown to be optimum. (ERA citation 04:033698)

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号