SRC-II Demonstration Project. Phase Zero, Task Number 2: Deliverable Number 6. Demonstration Plant Long Lead Procurement Report

机译:sRC-II示范项目。零阶段,任务编号2:可交付数量6.示范工厂长期采购报告

获取原文

摘要

This work was performed to identify long lead procurement activities required for the design and construction of a 6700 tons per stream day Solvent Refined Coal (SRC-II) Demonstration Plant. The plant design involves the use of both large scale and prototype process equipment which could potentially involve long design and fabrication times that must be ordered early to avoid schedule delay. The long lead items presented in this report were screened from the plant design described in Phase Zero Deliverable No. 1, Demonstration Plant Description. The equipment lists were reviewed to identify long lead equipment both large in scale and prototype. Selection of items was based on review of preliminary specifications and conditions of service with equipment fabricators and suppliers to establish probable delivery times. (ERA citation 05:011095)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号