首页> 美国政府科技报告 >Instrument Installation Design Criteria Safeguards Test and Evaluation System
【24h】

Instrument Installation Design Criteria Safeguards Test and Evaluation System

机译:仪器安装设计标准保障测试和评估系统

获取原文

摘要

Improved safeguards can be achieved by installing the latest sensor and instrument technology to allow process and nuclear material monitoring and data analysis with a high-speed data processing system. The design concept of such a system is presented. A primary objective of the safeguards development program is installation of a test and evaluation system in the Idaho Chemical Processing Plant at INEL for plant sensor and instrument operational testing. The system will be assembled over the next 20 months for test and evaluation support starting in FY 1980. Two parallel efforts are initiating the system development. The first is the data acquisition and processing system design by a joint INEL effort with EG and G and ENICO personnel. The second is a detailed ICPP installation design. The ICPP installation is emphasized for the purpose of providing background for the detailed installation design. (ERA citation 05:013184)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号