首页> 美国政府科技报告 >Post-Closure Inspection and Monitoring Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada for Calendar Year 2006.
【24h】

Post-Closure Inspection and Monitoring Report for Corrective Action Unit 417: Central Nevada Test Area Surface, Hot Creek Valley, Nevada for Calendar Year 2006.

机译:纠正行动单元417关闭后检查和监测报告:内华达州中部内陆测试区地面,2006年日历年内华达州热河谷。

获取原文

摘要

The inspections conducted at the UC-1 CMP revealed that no new cracks or fractures had developed until the fourth quarterly inspection, during which a crack was discovered requiring repair within 90 days. In addition, it was noted during the fourth quarte ...

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号