首页> 美国政府科技报告 >1-GWh Diurnal Load-LeveBing Superconducting Magnetic Energy Storage System Reference Design Appendix G:Design Study:Thyristor Converter Stations for Use With Superconducting Magnetic Energy Storage Systems
【24h】

1-GWh Diurnal Load-LeveBing Superconducting Magnetic Energy Storage System Reference Design Appendix G:Design Study:Thyristor Converter Stations for Use With Superconducting Magnetic Energy Storage Systems

机译:1-GWh昼夜负载 - 超导磁能储能系统参考设计附录G:设计研究:用于超导磁储能系统的晶闸管换流站

获取原文

摘要

The costs for the power conversion equipment for four different SMES systems were developed. These were 1- and 5-GWh units for 4- and 8-h charge periods. Only constant power operation of the converter was considered with 10% of the maximum energy remaining in the magnet at the end of the discharge cycle. The cost increases almost linearly with the maximum coil current between 30 kA and 150 kA, and the cost for a 4-h charge system is about 20% lower than for an 8-h charge system. The converter terminal cost is estimated to be $40/kW of installed power for a 1-GWh 4-h charge system at 30 kA maximum current and $60/kW of installed power for a 5-GWh 4-h charge system at 50 kA maximum current.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号