首页> 美国政府科技报告 >PIPELINE GAS DEMONSTRATION PLANT PhaseⅠABBREVIATED VERSION OF DEMONSTRATION PLANT DESIGN ANALYSIS SECTION 1 EXECUTIVE SUMMARY SECTION 2 DEMONSTRATION PLANT DESCRIPTIONS SECTION 3 DEMONSTRATION PLANT SITE ACQUISITION, CONSTRUCTION AND OPERATION SECTION 4 DEMONSTRATION PLANT DISPOSITION
【24h】

PIPELINE GAS DEMONSTRATION PLANT PhaseⅠABBREVIATED VERSION OF DEMONSTRATION PLANT DESIGN ANALYSIS SECTION 1 EXECUTIVE SUMMARY SECTION 2 DEMONSTRATION PLANT DESCRIPTIONS SECTION 3 DEMONSTRATION PLANT SITE ACQUISITION, CONSTRUCTION AND OPERATION SECTION 4 DEMONSTRATION PLANT DISPOSITION

机译:管道气体演示工厂第一阶段演示设计分析第一部分执行摘要第二部分演示工厂说明第三部分演示场地的获取,建设和运营第四部分演示工厂的处置

获取原文

摘要

This Demonstration Plant Design Analysis Report (DPDA) summarizes and defines the characteristics and requirements of the ICGG Demonstration Plant Design. It describes a completely integrated, single train, "grass roots" facility capable of processing a blend of Illinois Ncs. 5 & 6 seam coal into synthetic pipeline gas (SPG), plus fuel oil and naphtha byproducts. The size, approximately one quarter of a Commercial Plant train, is sufficiently large to demonstrate the com¬mercial viability of the process and minimize scale-up risks. Design modifications have also been incorporated to process Pittsburgh No. 8 seam and Western subbituminous coals in the same facility.

著录项

  • 作者

    R.J. Eby;

  • 作者单位
  • 年度 1980
  • 页码 1-223
  • 总页数 223
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com