首页> 美国政府科技报告 >Pipeline Gas Demonstration Plant. Phase 1. Abbreviated Version of Demonstration Plant Process Design. Section 4. Demonstration Plant Operations. Section 5. Special Tests. Section 6. Product-Byproducts. Section 7. Environmental Considerations
【24h】

Pipeline Gas Demonstration Plant. Phase 1. Abbreviated Version of Demonstration Plant Process Design. Section 4. Demonstration Plant Operations. Section 5. Special Tests. Section 6. Product-Byproducts. Section 7. Environmental Considerations

机译:管道燃气示范工厂。阶段1.演示工厂过程设计的缩略版。第4节示范工厂运营。第5节特殊测试。第6节产品 - 副产品。第7节。环境考虑因素

获取原文

摘要

The following subjects related to the demonstration plant design are considered in this volume: plant startup operation and shutdown; special tests which may be needed and require special equipment or even alternate method of operation; a discussion of product and by-products (fuel oils, naphtha, ammonia and sulfur); and finally environmental considerations (such as calculated emissions and waste streams, monitoring, mitigating measures, commitment of resources, alternatives and trade-off analysis). (ERA citation 06:001847)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号