首页> 美国政府科技报告 >Engineer, Design Construct, Test, and Evaluate a Pressurized Fluidized-Bed Pilot Plant Using High-Sulfur Coal for Production of Electric Power: Phase I. Preliminary Engineering; Phase II. Final Design; Phase III. Construction. Ann
【24h】

Engineer, Design Construct, Test, and Evaluate a Pressurized Fluidized-Bed Pilot Plant Using High-Sulfur Coal for Production of Electric Power: Phase I. Preliminary Engineering; Phase II. Final Design; Phase III. Construction. Ann

机译:工程师,设计构造,测试和评估使用高硫煤生产电力的加压流化床试验工厂:第一阶段初步工程;第二阶段。最终设计;第三阶段。施工。安

获取原文

摘要

The extended test program on the SGT/PFB Technology Unit, previously placed in operation, was completed. Total operating time is 3378 which includes 2681 h burning coal and 1205 h total turbine engine operation. Significant performance and operational milestones, completed during the past year, included: over 2000 h on candidate heat exchanger tube materials at design temperature during which durability of iron-base alloy for PFB heat exchanger tubes was demonstrated; generated electric power with gas turbine operating on PFB coal combustion gas for 1000 h with no appreciable erosion or corrosion of turbine rotor blades and stator vanes; evaluated and improved hot gas cleanup system during which mean particle size of 1.3 Microns and a loading of 0.054 grains/Scf was achieved; and durability of hot/ash solids lock hopper valves for over 1000 h without leakage and stellite coated butterfly gas valve operating successfully for over 900 h in a highly erosive environment was demonstrated. Details of materials evolutions and corrosion rates, component performances and gaseous emission levels are presented.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号