首页> 美国政府科技报告 >Case Study Analysis of Legal and Institutional Obstacles and Incentives to the Development of the Cornell Hydro Project at Cornell, Wisconsin
【24h】

Case Study Analysis of Legal and Institutional Obstacles and Incentives to the Development of the Cornell Hydro Project at Cornell, Wisconsin

机译:威斯康星州康奈尔市康奈尔水电项目发展的法律和制度障碍及激励案例分析

获取原文

摘要

The Cornell hydroelectric facility and flowage is located in Chippewa County, Wisconsin, with the power plant located in the city of Cornell, Wisconsin, on the Chippewa River. Northern States Power Company of Wisconsin is the owner of the Cornell project as well as the owner and operator of the dam, flowage, and power plant six miles upstream at Holcombe, Wisconsin. The project has been generating electricity at the rate of 100 million kW per year since commercial operation began in August of 1976. This operation results in the annual saving of nearly 3 million dollars over the cost of alternative oil-fired energy production. (ERA citation 05:031766)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号