首页> 美国政府科技报告 >Case Study Analysis of Legal and Institutional Obstacles and Incentives to the Development of the Hydroelectric Potential at Goose River, Maine
【24h】

Case Study Analysis of Legal and Institutional Obstacles and Incentives to the Development of the Hydroelectric Potential at Goose River, Maine

机译:缅因州鹅河水电潜力发展的法律制度障碍与激励案例分析

获取原文

摘要

The case study is an analysis of the legal, institutional, and financial incentives and obstacles to the development of the hydroelectric potential on the Goose River in Maine. The Goose River project concerns development by a private developer, Maine Hydro-Electric Development Corporation. The project is comprised of a five-dam system, with the first dam located at Swan Lake and the fifth dam about one mile from the sea. It will utilize the 7500 acre-feet of storage capacity of Swan Lake to run the four downstream power stations. The system is designed to generate 430 kWs of total capacity which would be sold to Central Maine Power, the local investor-owned public utility. (ERA citation 05:031763)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号