首页> 美国政府科技报告 >10 MWe Solar Thermal Central Receiver Pilot Plant: Solar Facilities Design Integration. Pilot Plant Availability
【24h】

10 MWe Solar Thermal Central Receiver Pilot Plant: Solar Facilities Design Integration. Pilot Plant Availability

机译:10兆瓦太阳能热中心接收器试验工厂:太阳能设施设计集成。试点工厂可用性

获取原文

摘要

In determining availability, only functional components of the subsystem that are unavailable to perform their required functions due to component failure (component forced outage) and due to planned maintenance (component planned outage) are taken into account. Support equipment, such as site structures (i.e., receiver tower), facility service equipment (i.e., service trucks and cranes), operations control (i.e., computer software), and passive components (i.e., piping), are assumed to be functional 100% of the time the pilot plant is in operation. Availability analysis of this kind of support equipment is beyond the scope of this report. The Beam Characterization Subsystem is not included in this availability analysis and the availability of the Collector Subsystem is assumed to be the assigned value. (ERA citation 10:051166)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号