首页> 美国政府科技报告 >10 MWe Solar Thermal Central Receiver Pilot Plant. Solar Facilities Design Integration. Construction Package No. 9 (RADL Item 7-33). Piping and Mechanical Equipment Installation
【24h】

10 MWe Solar Thermal Central Receiver Pilot Plant. Solar Facilities Design Integration. Construction Package No. 9 (RADL Item 7-33). Piping and Mechanical Equipment Installation

机译:10兆瓦太阳能热中央接收器试验工厂。太阳能设施设计集成。建筑包装第9号(RaDL第7-33项)。管道和机械设备安装

获取原文

摘要

Installed, tested and operable mechanical equipment, piping and accessories are presented for the Barstow Solar Pilot Plant. The work also includes furnishing and installing HVAC equipment and miscellaneous steel work; performing miscellaneous earthquake; and performance testing of the installed piping and mechanical equipment. (ERA citation 10:051161)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号