首页> 美国政府科技报告 >Quality Assurance of Civil Works During the Construction of the Nuclear Power Plant Unit II Angra DOS Reis in Brazil
【24h】

Quality Assurance of Civil Works During the Construction of the Nuclear Power Plant Unit II Angra DOS Reis in Brazil

机译:在巴西建造核电站II angra DOs Reis期间土建工程的质量保证

获取原文

摘要

The lecture summarizes the structure of the applied Quality Assurance Manual, which is subdivided into three sections: (1) Quality Assurance Program, (2) General Proceedings and (3) Inspection Programs. Since the power plant was designed according to DIN standards but supervision and construction are being performed following ASTM or Brazilian standards, the Quality Assurance Manual and the Quality Assurance organization were developed specifically for the Angra-Site. The applied system is illustrated by practical examples of pile foundations. Quality Assurance supervision and flow charts showing the interaction of the quality control organization. (Atomindex citation 14:742779)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号