首页> 美国政府科技报告 >System Planning Analysis Applied to OTEC: Initial Cases by Florida Power Corporation. Task II Report No. FC-5237-2
【24h】

System Planning Analysis Applied to OTEC: Initial Cases by Florida Power Corporation. Task II Report No. FC-5237-2

机译:应用于OTEC的系统规划分析:佛罗里达电力公司的初步案例。任务II报告编号FC-5237-2

获取原文

摘要

The objective of the task was to exercise the FPC system planning methodology on: (1) Base Case, 10 year generation expansion plan with coal plants providing base load expansion, and (2) same, but 400 MW of OTEC substituting for coal burning units with equal resultant system reliability. OTEC inputs were based on reasonable economic projections of direct capital cost and O and M costs for first-generation large commercial plants. OTEC inputs discussed in Section 2. The Base Case conditions for FPC system planning methodology involved base load coal fueled additions during the 1980's and early 1990's. The first trial runs of the PROMOD system planning model substituted OTEC for 400 MW purchases of coal generated power during 1988-1989 and then 400 MW coal capacity thereafter. Result showed higher system reliability than Base Case runs. Reruns with greater coal fueled capacity displacement showed that OTEC could substitute for 400 MW purchases in 1988-1989 and replace the 800 MW coal unit scheduled for 1990 to yield equivalent system reliability. However, a 1995 unit would need to be moved to 1994. Production costing computer model runs were used as input to Corporate Model to examine corporate financial impact. Present value of total revenue requirements were primary indication of relative competitiveness between Base Case and OTEC. Results show present value of total revenue requirements unfavorable to OTEC as compared to coal units. The disparity was in excess of the allowable range for possible consideration. (ERA citation 05:018644)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号