首页> 美国政府科技报告 >Operation and Maintenance of DOE/PETC 700 H.P. Combustion Test Facility 100-20 H.P. Firetube Boiler Test Facility Contract No. De-AC02-78ET13011. Quarterly Activity Report, Jun 30, 1980-Sep 29, 1980: Third Quarter
【24h】

Operation and Maintenance of DOE/PETC 700 H.P. Combustion Test Facility 100-20 H.P. Firetube Boiler Test Facility Contract No. De-AC02-78ET13011. Quarterly Activity Report, Jun 30, 1980-Sep 29, 1980: Third Quarter

机译:DOE / pETC 700的操作和维护H.p.燃烧测试设施100-20 H.p. Firetube锅炉测试设施合同号De-aC02-78ET13011。 1980年6月30日至1980年9月29日季度活动报告:第三季度

获取原文

摘要

Successful testing activities were completed on all boiler installations during the reporting period. The major portion of the activity centered around preparation and operation of the 100 H.P. boiler for testing with SRC fuels. Six days of successful operation were completed on No. 6 fuel oil, SRC slurry and melted SRC I. Two successful test runs on 40% COM with Illinois coal were completed on the 700 H.P. unit and four successful runs with SRC II and No. 2 fuel oil were completed on the 20 H.P. boiler. (ERA citation 06:006912)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号