首页> 美国政府科技报告 >Development of a Site-Fabricated, Building Integrated Air Solar System. Final Report, September 30, 1977-April 30, 1980
【24h】

Development of a Site-Fabricated, Building Integrated Air Solar System. Final Report, September 30, 1977-April 30, 1980

机译:开发现场制造的建筑一体化空气太阳能系统。最终报告,1977年9月30日至1980年4月30日

获取原文

摘要

The results of a two year project to develop, thoroughly test, and optimize a complete site-fabricated solar air heating system are presented. The project has produced the only site-fabricated air collector at this time to be fully tested to ASHRAE 93-77 standards and the HUD 30-day stagnation test; it is found that the collector performs as well as any standard commercially manufactured air collector, but for only one-third the cost. The initial stage of the project consisted of a detailed survey of existing site-built installations throughout the country, the generation of innovative designs, the selection of the six best designs, a thorough analysis of these, and the choice of the best design for further work. The chosen design then underwent extensive development. A central part of the project was the study of all the available collector materials: glazings, paints, coatings, caulks, absorber plates, structural materials, and fasteners. With the results of the materials study, the collector design was further optimized in terms of theoretical efficiency, ease of construction, appearance, and durability. The result of the entire project is a tested, proven design, and with more than 15 fully operating systems in buildings throughout the Northeast, including both retrofit and new construction. The final product is detailed construction manual with step-by-step instructions, complete construction drawings, and background information on materials and design options. (ERA citation 05:025761)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号