首页> 美国政府科技报告 >Case Study Analysis of the Legal and Institutional Obstacles and Incentives to the Development of the Hydroelectric Power at the Maxwell Locks and Dam, Pennsylvania
【24h】

Case Study Analysis of the Legal and Institutional Obstacles and Incentives to the Development of the Hydroelectric Power at the Maxwell Locks and Dam, Pennsylvania

机译:宾夕法尼亚州马克斯韦尔洛克斯大坝水电开发的法律制度障碍与激励案例分析

获取原文

摘要

The legal, institutional and financial obstacles, and incentives to the development of hydroelectric power at the Maxwell locks and dam on the Monongahela River are analyzed. The study is one of five studies prepared by the Energy Law Institute pursuant to a contract with the National Conference of State Legislators. Each of the five studies views dam development by a different category of developer. These categories include a municipality, a public utility, a state, a private developer, and a cooperative. The Maxwell case study concerns potential development by Allegheny Electric Cooperative. Thus, the analysis of obstacles and incentives is focused on those factors which have particular impact on a cooperative. Subjects covered include a description of the site; developer description; the feasibility study; the economic feasibility; financing; Federal licensing by FERC; state licensing; local interest and requirements; the effect of locks and dam operation by the Army Corp of Engineers; and power marketing. (ERA citation 05:031767)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号