首页> 美国政府科技报告 >Flowsheet. 9 Month out-of-Pile Time and 18 Month out-of-Pile Time.
【24h】

Flowsheet. 9 Month out-of-Pile Time and 18 Month out-of-Pile Time.

机译:工艺流程。 9个月的桩外时间和18个月的桩外时间。

获取原文

摘要

This contribution consists of two flow sheets quantifying the fuel cycle logistics for an LMFBR, one with 9 months and one with 18 months fuel cycle hold up time. Details are given of the flows and inventories of uranium and plutonium at points round the fuel cycle, and include the quantities of higher actinides and fission product activity arising. (Atomindex citation 11:538572)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号