首页> 美国政府科技报告 >Engineering Report on the Brushy Basin Drilling Project, Cedar Mountain, Emery County, Utah
【24h】

Engineering Report on the Brushy Basin Drilling Project, Cedar Mountain, Emery County, Utah

机译:犹他州埃默里县雪松山刷盆地钻探工程工程报告

获取原文

摘要

The Brushy Basin drilling project was conducted by Bendix Field Engineering Corporation (BFEC) in support of the United States Department of Energy (DOE) National Uranium Resource Evaluation (NURE) program. This project consisted of 12 drill holes (table 1), ranging in depth from 101 feet (30.78 m) to 920 feet (280.39 m). A total of 6,867.5 feet (2,093.17 m) was drilled by rotary methods. Purpose was to obtain subsurface data for estimating the intermediate-grade (0.01 percent to 0.05 percent U sub 3 O sub 8 ) uranium resources of the Brushy Basin Member of the Morrison Formation (Jurassic) in the Cedar Mountain area of the San Rafael swell, Emery County, Utah. Drilling began on June 16, 1979, and was completed on July 29, 1979, with final site restoration. (ERA citation 05:018417)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号