首页> 美国政府科技报告 >Fort Hood Solar Total Energy Project: Technical Support and Systems Integration. Third Semiannual Report, May 1, 1979-October 31, 1979
【24h】

Fort Hood Solar Total Energy Project: Technical Support and Systems Integration. Third Semiannual Report, May 1, 1979-October 31, 1979

机译:胡德堡太阳能总能源项目:技术支持和系统集成。第三次半年度报告,1979年5月1日至1979年10月31日

获取原文

摘要

Work on the Fort Hood STES which was planned by DOE as a Large Scale Experiment for the Solar Total Energy Program is described. The history of the design evolution and management of the project which began in 1973 is summarized. The project was discontinued by DOE in December 1979. Supporting studies underway at the time are reported including: (1) reassessment of energy loads, (2) revised system concept, (3) plant sizing calculations, and (4) insolation variation measurement planning. (ERA citation 05:020351)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号