首页> 美国政府科技报告 >Allocation of NRC Inspection Effort to Risk-Related Activities in Nuclear Power Plants
【24h】

Allocation of NRC Inspection Effort to Risk-Related Activities in Nuclear Power Plants

机译:NRC对核电厂风险相关活动的检查工作分配

获取原文

摘要

The inspection modules in the NRC inspection program for the Preoperational Test, Startup Test, and Operation phases of nuclear power plants were examined to assess whether manhours invested in each inspection were commensurate with the potential of these inspections for detecting conditions which would contribute significantly to risk. No basis was found in this assessment for fundamental changes to the inspection program. However, to improve program effectiveness, some modifications to specific parts of the program appear to be warranted.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号