首页> 美国政府科技报告 >DRAGLINE ROLLER TRACK IMPROVEMENT VOLUME II FIELD MEASUREMENT OF DRAGLINE ROLLER CIRCLE LOADING FINAL REPORT VOLUME II FOR CONTRACT PERIOD SEPTEMBER 30, 1976-JULY 30, 1980
【24h】

DRAGLINE ROLLER TRACK IMPROVEMENT VOLUME II FIELD MEASUREMENT OF DRAGLINE ROLLER CIRCLE LOADING FINAL REPORT VOLUME II FOR CONTRACT PERIOD SEPTEMBER 30, 1976-JULY 30, 1980

机译:DRaGLINE ROLLER TRaCK改进第二卷现场测量DRaGLINE ROLLER CIRLLE LOaDING FINaL REpORT第二卷合同期限1976年9月30日 - 1980年7月30日

获取原文

摘要

The Franklin Research Center (FKC), a Division of the Franklin Institute, was contracted by the Bureau of Mines to improve walking dragline roller tracks. The contract was subsequently transferred to the Department of Energy.nThe period from September 1977 to September 1978 covered laboratory rolling contact rig tests to evaluate typical low hardness dragline track materials. The results of this work are covered by DOE/ET/9121-1 Final Report, Volume I.nThe period from September 1978 to July 1980 covered field measurements of dragline roller circle loadings. The results of this work are covered by DOE/ET/9121-2 Final Report, Volume II.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号