首页> 美国政府科技报告 >Electrodril System Field Test Program. Phase II: Task C-1-Deep Drilling System Demonstration. Final Report for Phase II: Task C-1
【24h】

Electrodril System Field Test Program. Phase II: Task C-1-Deep Drilling System Demonstration. Final Report for Phase II: Task C-1

机译:Electrodril系统现场测试程序。第二阶段:任务C-1-深钻系统演示。第二阶段的最终报告:任务C-1

获取原文

摘要

The Electrodril Deep Drilling System field test demonstrations were aborted in July 1979, due to connector problems. Subsequent post test analyses concluded that the field replacable connectors were the probable cause of the problems encountered. The designs for both the male and female connectors, together with their manufacturing processes, were subsequently modified, as was the acceptance test procedures. A total of nine male and nine female connectors were manufactured and delivered during the 2nd Quarter 1980. Exhaustive testing was then conducted on each connector as a precursor to formal qualification testing conducted during the month of October 1980, at the Brown Oil Tool test facility located in Houston, Texas. With this report, requirements under Phase II, Task C-1 are satisfied. The report documents the results of the connector qualification test program which was successfully completed October 28, 1980. In general, it was concluded that connector qualification had been achieved and plans are now in progress to resume the field test demonstration program so that Electrodril System performance predictions and economic viability can be evaluated. (ERA citation 06:020679)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号