首页> 美国政府科技报告 >Load Combination Program Project II Load Combination Methodology Development, Interim Report II
【24h】

Load Combination Program Project II Load Combination Methodology Development, Interim Report II

机译:负荷组合方案项目II负荷组合方法开发,中期报告II

获取原文

摘要

This second interim report on load combination methodology development has focused on two objectives: methodology development for combining generic dynamic responses, and the application of the load combination methodology to nuclear power plant components. Different component designs have been analyzed in terms of the methodology. Two examples are provided. One is a simple, highly idealized example that illustrates the essential aspects of developing probabilistic design criteria for multiple loadings. The second, more realistic example is a segment of an essential service water line subjected to internal pressure, dead weight, earthquake, an hydraulic transient, and thermal expansion.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号