首页> 美国政府科技报告 >Cost of Implementing AECB Interim Criteria for the Closeout of Uranium Tailings Sites. A Report Prepared for the Atomic Energy Control Board
【24h】

Cost of Implementing AECB Interim Criteria for the Closeout of Uranium Tailings Sites. A Report Prepared for the Atomic Energy Control Board

机译:实施aECB关闭铀尾矿场地临时标准的成本。为原子能控制委员会编写的报告

获取原文

摘要

The main purpose of this study was to arrive at a gross approximation of the costs to the Canadian uranium mining industry of meeting the proposed closeout criteria established by the Atomic Energy Control Board for tailings deposits. Two options have been investigated: on-land disposal and underlake disposal. Given the budget allocated to the study, the estimates must be understood as approximations. Overall cost figures for the Canadian uranium mining industry are linear extensions from a hypothetical base case. The results of a conference held in Ottawa on February 25 and 26 to discuss the proposed AECB interim criteria for the closeout of uranium tailings sites are also included. Representatives from mining firms, provincial regulatory authorities, universities and the Atomic Energy Control board attended the conference. (Atomindex citation 13:702720)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号