Human-Factors-Engineering Control-Room Design Review/Audit Report. Callaway Plant Unit 1, Union Electric Company

机译:人因工程控制室设计审查/审计报告。联合电气公司卡拉威工厂1号机组

获取原文

摘要

A human factors engineering preliminary design review of the Callaway Plant Unit 1 control room was performed at the site on July 29 through July 31, 1981. Observed human factor design discrepancies were given a priority rating of one to three, based on the increased potential for operator error and the possible consequences of that error. A list of those items that could not be evaluated is presented in the first section of this report. (ERA citation 07:014492)