首页> 美国政府科技报告 >1000 Hour Test Programme in a Pressurised Fluidised Bed Combustion Facility. Volume II. Test Data. Final Report
【24h】

1000 Hour Test Programme in a Pressurised Fluidised Bed Combustion Facility. Volume II. Test Data. Final Report

机译:加压流化床燃烧设施中的1000小时测试程序。第二卷。测试数据。总结报告

获取原文

摘要

This is an appendix to a report on the operation and performance of pressurized fluidized bed combustors and their associated hot gas cleanup system with cyclone separators for use in a combined-cycle power plant. Each of 6 performance tests is described and the results for each test are given. For each test, data are presented on: combustor operating conditions; bed particle size distribution for both coal and dolomite feeds; heat and mass balances; sulfur retention; size and composition of particles in hot gas stream; and composition of solid wastes from combustor. (ERA citation 07:004015)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号