首页> 美国政府科技报告 >Fusion Engineering Device (FED) Configuration and Maintenance
【24h】

Fusion Engineering Device (FED) Configuration and Maintenance

机译:融合工程设备(FED)配置和维护

获取原文

摘要

This paper addresses the subject of how the FED baseline configuration provides for replacement of major machine components in the event of wear-out or failure. The maintenance aspects of the configuration are emphasized. Specifically, removal/replacement scenarios and their associated time spans are summarized for twelve major FED cmponents. These scenarios were developed concurrently with the development of the baseline configuration to assure conformance with maintenance requirements. The results show that eight of the twelve components investigated are amenable to straightforward removal and replacement techniques which can be performed in 45 days or less. Two additional components, the TF coils and one PF coil, exhibit relatively straightforward removal/replacement characteristics but require an extensive time span as a consequence of the large amount of intervening equipment which must also be removed and replaced. (ERA citation 07:013486)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号