Preliminary Design Study of Underground Pumped Hydro and Compressed-Air Energy Storage in Hard Rock. Volume 13. CAUPH Preliminary Licensing Documentation. Final Report

机译:硬岩地下抽水与压缩空气储能初步设计研究。第13卷.CaUpH初步许可文档。总结报告

获取原文

摘要

This volume documents the current regulatory requirements for licensing permits and approvals applicable to implementing either the Compressed Air Energy Storage (CAES) facility or the Underground Pumped Hydroelectric (UPH) facility at a specific site location in Montgomery County, Maryland. An implementation plan and schedule is also developed for the period from project authorization by the sponsor through receipt of all required regulatory authorizations. The documentation is based upon review of all pertinent regulations on the federal, state and local level of government, review of other publications, acquisition of applicable guides and forms, and discussions with responsible agency representatives. The implementation plan is specific to the requirements within the State of Maryland; the plan is based primarily upon the state's siting procedure which provides coordinated state agency approvals. Notwithstanding the site specific nature of the plan, many of the regulatory requirements, as well as the approach to implementation, should be suitable for general reference in developing licensng plans for CAES or UPH facilities. (ERA citation 81:025213)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号