首页> 美国政府科技报告 >Extension of the Phoenix/City of Colorado Springs Solar-Assisted Heat-Pump Project. Technical Progress Report No. 18, Sixth Quarterly Report, 1 October 1980-31 January 1981
【24h】

Extension of the Phoenix/City of Colorado Springs Solar-Assisted Heat-Pump Project. Technical Progress Report No. 18, Sixth Quarterly Report, 1 October 1980-31 January 1981

机译:延伸凤凰城/科罗拉多斯城太阳能辅助热泵项目。技术进步报告第18号,第六季度报告,1980年10月1日至1981年1月31日

获取原文

摘要

Three gas-driven heat pumps are being considered, which are a Wisconsin engine drive heat pump, a Stirling engine drive heat pump, and a gas turbine drive heat pump. Also considered is an electric driven heat pump. Cost effectiveness of both the electric driven and gas fired solar-assisted heat pumps is demonstrated by comparing the present value of the system over its 20 year life with the present value of the fuel saved in Denver and Colorado Springs. The opinions of the local electric utilities for both cities and the natural gas pipeline company are briefly discussed. (ERA citation 07:049830)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号