首页> 美国政府科技报告 >Asphalt Saturation of Roofing Felt on the Felt Machine. Final Report. Progress Report, January 1980-July 1981
【24h】

Asphalt Saturation of Roofing Felt on the Felt Machine. Final Report. Progress Report, January 1980-July 1981

机译:毛毡机屋面毡的沥青饱和度。总结报告。进展报告,1980年1月至1981年7月

获取原文

摘要

The asphalt roofing industry manufactures approximately 10 million tons of product annually. This requires an estimated 40 trillion Btu's in process heat and 4 million tons of asphalt having a fuel value of 140 trillion Btu's. Pilot equipment was installed on a commercial felt machine to determine whether saturation on the felt machine was feasible and whether energy savings would result. A process was demonstrated by which adequate saturation levels can be achieved. Energy savings are estimated at 6.3 trillion Btu's per year on an industry-wide basis. An economic study with consideration of the rapid industry conversion from organic felt to the less energy-intensive glass mat-based roofing precluded further process scale-up and plans for commercialization. (ERA citation 07:044045)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号