首页> 美国政府科技报告 >Conceptual Design Study: Standard Floating Nuclear Power Plant on Inshore Site and Modified Floating Nuclear Power Plant on Upriver Site
【24h】

Conceptual Design Study: Standard Floating Nuclear Power Plant on Inshore Site and Modified Floating Nuclear Power Plant on Upriver Site

机译:概念设计研究:陆上站点标准浮动核电站和上游站点改造浮动核电站

获取原文

摘要

Both plants/designs are technically feasible. Both compare favorably with conventional nuclear plants with respect to licensability, quality of construction, reliability of operation, and safety. Both offer considerable reductions in construction schedule over conventional nuclear plants. It has been estimated that if project durations were reduced by three years the cost of a 1100 MWe nuclear unit could be decreased by $260 million to $450 million. The allowance for funds during construction (AFDC) was estimated to be $929 million for a 1260 MWe nuclear plant with a commercial operation date in 1992. Reducing the schedule from 12 to 9 years, a reduction of 25%, implies a savings in AFDC alone of approximately $230 million.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号