首页> 美国政府科技报告 >IEA Grimethorpe Pressurized Fluidized-Bed Test Facility Tube Bank C Design, Installation and Commissioning
【24h】

IEA Grimethorpe Pressurized Fluidized-Bed Test Facility Tube Bank C Design, Installation and Commissioning

机译:IEa Grimethorpe加压流化床测试设备管束C设计,安装和调试

获取原文

摘要

The report examines the reasons for testing a further tube bank, after Tube Bank 'A' , at the Grimethorpe Experimental Facility. The design criteria and operating conditions for Tube Bank 'C' are detailed, together with the main mechanical design features. An account of the installation and commissioning of Tube Bank 'C' is given, with a preliminary analysis of the operational data obtained from the hot shakedown tests. (ERA citation 08:025980)