Construction and Operation of a Prototype RESOX Plant in Conjunction with Bergbau-Forschung FGD System. Final Report

机译:与Bergbau-Forschung FGD系统相结合的原型REsOX工厂的建设和运行。总结报告

获取原文

摘要

This report describes work done on an EPRI sponsored program intended to evaluate a dry FGD system. The program combined an existing Bergbau-Forschung activated coke SO sub 2 regenerative adsorption plant with the Foster Wheeler RESOX process. This process reduces concentrated SO sub 2 from the adsorption plant regenerator to elemental sulfur using coal as a reactant. The front end adsorption plant operates with a 43MW slip stream from the Kellerman Power Station located in Luenen, Germany. The EPRI funded program designed, built and tested the RESOX system in conjunction with operation of the Bergbau-Forschung FGD plant. Throughout the report mechanical performance aspects of the program are emphasized. The RESOX system processed SO sub 2 rich gas for an accumulated total of 1000 hours. Experience gained during this operation is discussed. (ERA citation 07:056039)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号