首页> 美国政府科技报告 >Goodyear Lake Hydroelectric Generating Station Redevelopment Final Construction and Cost Report. DOE Small-Scale Hydroelectric Demonstration Program
【24h】

Goodyear Lake Hydroelectric Generating Station Redevelopment Final Construction and Cost Report. DOE Small-Scale Hydroelectric Demonstration Program

机译:固特异湖水电站再开发最终建设和成本报告。能源部小型水电示范项目

获取原文

摘要

This project is one of the US Department of Energy's original seven low-head hydroelectric demonstration projects. The demonstration project was initiated by the release of a Program Opportunity Notice (PON) ET-78-N-07-1711 dated November 1, 1978. The purpose for the demonstration is to show the feasibility of small hydroelectric power development projects at a number of existing dam sites across the country. The Goodyear Lake Power Station provided an excellent example of the redevelopment of a discontinued low-head hydroelectric facility. The dam and power station were previously owned by the New York State Electric and Gas Corporation. Prior to F.W.E. Stapenhorst's involvement, it was the Utility's intention to breach the dam and dewater the lake. In order to rehabilitate the power station, title was transferred to F.W.E. Stapenhorst Inc., upon finalization of a Power Agreement (whereby F.W.E. Stapenhorst Inc. would sell the power generated to New York State Electric and Gas Corporation) and issuance of the FERC license. The station, as renovated, is fully automatic and utilizes two Ossberger Cross-Flow type turbines - turbines which, due to their flat efficiency curve, are well suited for small rivers and streams where the flow varies over a wide range. Both technical and financial feasibility of the project were carefully analyzed prior to the commencement of the project. (ERA citation 07:061044)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号