首页> 美国政府科技报告 >Brief Reconnaissance Study for the Addition of Hydropower for Tate Dam, Boone, North Carolina
【24h】

Brief Reconnaissance Study for the Addition of Hydropower for Tate Dam, Boone, North Carolina

机译:对北卡罗来纳州布恩泰特大坝增加水电的简​​要侦察研究

获取原文

摘要

The following are presented: summary sheet; site description; business data; environmental, institutional, and safety data; plant characteristics and power potential; project economics; and photographs. It is concluded that the repair of the hydroelectric equipment at this site appear to be economically feasible if the cost of money is less than ten percent. (ERA citation 09:009575)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号