首页> 美国政府科技报告 >Brief Reconnaissance Study for the Addition of Hydropower for Lake Manatee Dam, Bradenton, Florida
【24h】

Brief Reconnaissance Study for the Addition of Hydropower for Lake Manatee Dam, Bradenton, Florida

机译:佛罗里达州布雷登顿马纳泰湖水坝增加水电的简​​要侦察研究

获取原文

摘要

The following are presented: summary sheet; site description; business data; environmental, institutional, and safety data; plant characteristics and power potential; project economics; and photographs. It was concluded that the development of hydroelectric power at this site does not appear to be economically feasible. (ERA citation 09:009566)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号