首页> 美国政府科技报告 >Brief Reconnaissance Study for the Addition of Hydropower for Randolph Mills No. 2 Dam, Franklinville, North Carolina
【24h】

Brief Reconnaissance Study for the Addition of Hydropower for Randolph Mills No. 2 Dam, Franklinville, North Carolina

机译:对北卡罗来纳州富兰克林维尔2号大坝Randolph mills增加水电的简​​要侦察研究

获取原文

摘要

The following are presented: summary sheet; site description; business data; environmental, institutional, and safety data; plant characteristics and power potential; project economics; and photographs. It is concluded that the development of hydroelectric power at this site appears to be economically feasible. (ERA citation 09:009569)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号